
Projects
This is a snapshot of projects that we’ve tackled. To date, we’ve removed over 250,000 pounds of material from our public spaces, natural areas, and surrounding properties.
“4PA has done so much for our town in a very short amount of time. Many thanks from all of us.”
Video by Jesse Major Photography

Peabody Creek before

Peabody Creek after

Overgrown downtown parking lot

Opened up downtown parking lot

Peabody Creek before

Peabody Creek after

Peabody Creek before

Peabody Creek after

Peabody Creek before

Peabody Creek after

Private business site before

Private business site after

Upper Peabody Creek valley before

Upper Peabody Creek valley after

Olympic Discovery Trail before

Olympic Discovery Trail after

Tumwater Creek valley before

Tumwater Creek valley after

Returning shopping carts

Quad hauling for the win!

Pack it up and haul it out!

Some jobs require some specialty gear

Hillside above Peabody Creek

Post cleanup signs

Gotta have some laughs along the way!

4PA truck with a load to dump
Cherry Hill before

Cherry Hill after

Upper Peabody Creek before

Upper Peabody Creek after

Downtown building before

Downtown building after

Land near fairgrounds before

Land near fairgrounds after

8th Street bridge before

8th Street bridge after

Upper Peabody Creek before

Upper Peabody Creek after

Upper Peabody Creek before

Upper Peabody Creek after

Tumwater Creek before

Tumwater Creek after

Tumwater Creek before

Tumwater Creek after

Peabody Creek boardwalk before

Peabody Creek boardwalk after (in partnership with Port Angeles Lions Club and Rural Development Initiatives)

Tumwater Creek before

Tumwater Creek after