Projects This is a snapshot of projects that we’ve tackled. To date, we’ve removed over 250,000 pounds of material from our public spaces, natural areas, and surrounding properties. “4PA has done so much for our town in a very short amount of time. Many thanks from all of us.” — Gayeileen D. Video by Jesse Major Photography Peabody Creek before Peabody Creek after Overgrown downtown parking lot Opened up downtown parking lot Peabody Creek before Peabody Creek after Peabody Creek before Peabody Creek after Peabody Creek before Peabody Creek after Private business site before Private business site after Upper Peabody Creek valley before Upper Peabody Creek valley after Olympic Discovery Trail before Olympic Discovery Trail after Tumwater Creek valley before Tumwater Creek valley after Returning shopping carts Quad hauling for the win! Pack it up and haul it out! Some jobs require some specialty gear Hillside above Peabody Creek Post cleanup signs Gotta have some laughs along the way! 4PA truck with a load to dump Cherry Hill before Cherry Hill after Upper Peabody Creek before Upper Peabody Creek after Downtown building before Downtown building after Land near fairgrounds before Land near fairgrounds after 8th Street bridge before 8th Street bridge after Upper Peabody Creek before Upper Peabody Creek after Upper Peabody Creek before Upper Peabody Creek after Tumwater Creek before Tumwater Creek after Tumwater Creek before Tumwater Creek after Peabody Creek boardwalk before Peabody Creek boardwalk after (in partnership with Port Angeles Lions Club and Rural Development Initiatives) Tumwater Creek before Tumwater Creek after